Gravel, Paths & Edging • 6 min read

How Much MOT Type 1 Sub-Base Do I Need? (UK Patio & Shed Base Guide)

Laying paving slabs, artificial grass, or a heavy garden shed directly onto soft UK topsoil leads to sunken corners and rocking slabs within a single wet winter. Calculating compacted MOT Type 1 hardcore accurately gives you a rock-solid foundation.

The UK Compacted MOT Type 1 Tonnage Formula

Multiply your base area in square metres by your finished compacted depth in metres (0.075m to 0.15m), then multiply by 2.05 tonnes per m³ (which accounts for both stone density and 25% plate compaction):

UK Compacted Hardcore Formula

MOT Type 1 Tonnes = Area (m²) × Compacted Depth (m) × 2.05 • Bulk Bags ≈ Tonnes ÷ 0.85

A 3.0m × 2.4m (10ft × 8ft) shed base (7.2 m²) compacted to 100mm (0.10m) depth needs 7.2 × 0.10 × 2.05 = 1.48 tonnes—which equals two 850kg builders bulk bags (leaving a handy 220kg buffer).

Calculate exact compacted tonnes, 850kg bulk bags, and loose wheelbarrows for paths, patios, and shed bases using our MOT Type 1 Sub-Base Aggregate Calculator.

Quick-Lookup UK Area to MOT Type 1 Tonnes & Bulk Bags Chart

Base Area (m²)75mm Path (Tonnes)100mm Patio/Shed (Tonnes)850kg Bulk Bags (100mm)
6 m² (8ft × 6ft Shed / Greenhouse)0.92 tonnes1.23 tonnes2 bulk bags
10 m² (10m × 1m Garden Path)1.54 tonnes2.05 tonnes2.5 bulk bags (order 3)
15 m² (Small Back Garden Patio)2.31 tonnes3.08 tonnes4 bulk bags
25 m² (Large Family Patio)3.84 tonnes5.13 tonnes6 bulk bags
Membrane Separation & Compaction Rule: Always lay a non-woven geotextile separation membrane over excavated clay subsoil before tipping MOT Type 1 so damp clay does not pump upward into the stone fines. Mist dry aggregate lightly with a hose and compact in 75mm maximum layers with a vibrating wacker plate (wearing ear defenders and steel-toe boots).

Useful Sub-Base Preparation & Levelling Gear

As an Amazon Associate I earn from qualifying purchases. If you buy via our UK links, we may earn a small commission at no extra cost to you.

Heavy-Duty Cast Iron Hand Tamper (200mm × 200mm)

Solid steel-shafted ground rammer for compacting tight shed base corners and narrow path trenches.

Check Price on Amazon UK →

Non-Woven Geotextile Sub-Base Separation Membrane

Heavy-duty stabilisation fabric that stops soft UK clay pumping upward into MOT Type 1 hardcore.

Check Price on Amazon UK →

1.8m Aluminium Builders Spirit Level & Screed Bar

Long straight-edge spirit level for checking fall gradients (1:60 away from house walls) across sub-bases.

Check Price on Amazon UK →

Frequently Asked Questions

How much does MOT Type 1 aggregate shrink when compacted with a wacker plate?

Loose MOT Type 1 crushed aggregate compacts down by roughly 20% to 25% under a vibrating plate compactor—so to finish with a solid 100mm (4-inch) sub-base, spread 125mm of loose hardcore and multiply volume by 2.0 to 2.1 tonnes per cubic metre.

What depth of MOT Type 1 sub-base do I need for a garden patio vs. a shed base?

Lay 75mm (3 inches) of compacted MOT Type 1 for light foot-traffic garden paths, 100mm (4 inches) for garden patios, greenhouses, and heavy timber sheds, and 150mm (6 inches) for driveways or hot-tub pads.

Related Sub-Base & Paving Calculators

MOT Type 1 Sub-Base Aggregate Calculator

Calculate compacted MOT Type 1 hardcore tonnes and bulk bags for paths and shed bases.

Open Calculator →

Paving Slab & Jointing Compound Calculator

Work out slab counts, wastage buffer, and brush-in jointing compound tubs for patios.

Open Calculator →

Sharp Sand & Bedding Mortar Mix Calculator

Calculate sharp sand and cement bag ratios for bedding patio slabs and edging.

Open Calculator →